Diverter System for BC7-CV11 Chute, TNB Manjung 5, Perak


Client
:
TNB Power Generation Sdn. Bhd.
About the project
This Contract covers the Engineering, Procurement, Construction and Commissioning (EPCC) for the design, supply, installation and commissioning of a diverter system for the BC7-CV11 chute at TNB Manjung 5, Sultan Azlan Shah Power Station.
The scope involves the provision of a flexible coal diverter system connecting the M4 Bunker conveyors (BC-7A and BC-7B) to the M5 Bunker conveyors (CV-11A and CV-11B). The system is designed to handle coal discharge capacity of 1,400/ 1,540 TPH (the existing capacity is 1,200 TPH). This provide alternative coal flow routes between the two conveyor sets, overcoming the limitations of the existing one-to-one conveyor arrangement and ensuring continuous coal transfer during conveyor breakdowns or maintenance activities.