Diverter System for BC7-CV11 Chute, TNB Manjung 5, Perak

Diverter System for BC7-CV11 Chute, TNB Manjung 5, Perak
Diverter System for BC7-CV11 Chute, TNB Manjung 5, Perak

Client

:

TNB Power Generation Sdn. Bhd.

About the project

This Contract covers the Engineering, Procurement, Construction and Commissioning (EPCC) for the design, supply, installation and commissioning of a diverter system for the BC7-CV11 chute at TNB Manjung 5, Sultan Azlan Shah Power Station.


The scope involves the provision of a flexible coal diverter system connecting the M4 Bunker conveyors (BC-7A and BC-7B) to the M5 Bunker conveyors (CV-11A and CV-11B). The system is designed to handle coal discharge capacity of 1,400/ 1,540 TPH (the existing capacity is 1,200 TPH). This provide alternative coal flow routes between the two conveyor sets, overcoming the limitations of the existing one-to-one conveyor arrangement and ensuring continuous coal transfer during conveyor breakdowns or maintenance activities.



Before Modification
Before Modification

Share this event

681426-X

Tel: 603-7957 3686

Fax: 603-7968 8787

Suite 702, Level 7, PJ Tower, AMCORP Trade Centre, 18 Persiaran Barat, 46200 Petaling Jaya,
Selangor, Malaysia

linked-in_follow.png

2026 © Mutiara Etnik Sdn Bhd. All rights reserved.

bottom of page