top of page

PROJECTS

List of current and previous projects and services.

00b-Company-Names-on-SUL-3.jpg

Material Handling System 1/2012 Packages 1 – Ship Unloader SUL3

 

- Lekir Bulk Terminal Sdn Bhd

This Contract LBT 1/2012 – is for the Engineering, Procurement, Construction and Commissioning of Grab Type Ship Unloader (SUL3) with 82t hook capacity and discharging onto the existing berth conveyors BC1 or BC2.
The Scope of Work includes design, detail engineering, structures fabrication, components procurement, assembly at shop, painting, testing at shop, roll-on to barge and transport to site in fully assembled condition, Roll-off to existing jetty rails, hook-up works, obtaining relevant statutory approvals, testing, commissioning and training to Employer’s Personnel.

 

Special Features:    

  • Second largest grab ship unloader in the world

  • Suitable for handling multiple bulk cargos 

  • Designed to unload cargo from 25,000 DWT to 400,000 DWT vessels

  • Designed to unload ship on both seaward side and landward side.

  • Twin outlet discharge hopper mounted on load cells.

  • Designed to discharge cargo onto three wharf conveyors by means of a rotating conveyor

Manjung 1-3; Existing Coal Stockyard Extension Project, Manjung Power Plant Perak

- IHI Power System (M) Sdn Bhd

The present scope covers the requirement of Detail Engineering, Supply, Installation & Commissioning of the mechanical works of the Existing Coal Stockyard Extension Project.

20130907_151059.jpg

Mechanical & Electrical Rectification Works for Slag / Fertilizers Terminal Jetty at Dry Bulk Terminal 2 (DBT 2)

- Westports (M) Sdn Bhd

The present scope covers the requirement of Detail Engineering, Supply, Installation & Commissioning of the rectification works on Damaged DBT-2 Wharf Conveyor. This Scope involves the following:

  • Removal of existing damaged structures including belt, pulleys, sheeting, chute and etc . Preparation of fabrication drawings similar to the existing structures, reinstatement of foundation, support trestles, conveyor gallery structures, conveyor stringers, short posts and necessary sheeting’s.  Also, the scope includes installation of handrail at the wharf.

  • Supply and install Idler Frames with HDPE rollers, Belt (for the entire length of the conveyor), Drive Pulley, Snub Pulleys, Belt Scrapers, Firefighting Line, Process Water Line and etc.

  • Electrical & Automation parts including conveyor safety switches, local control panels and necessary power & control cables.

  • Rectification and reinstatement of Transfer Tower TT-B includes removal of damaged structures, Supply and erect structures, purlins & sheeting.

The Design, Manufacture, Supply and Deliver of Telecommunication Tower for The Proposed BTS and MW Sites for The Proposed Secured Digital Government Integrated Radio Network (GIRN)

-Sapura Research Sdn Bhd

The scope of works includes:

 

  • Design - Tower and Mast Analysis and Design

       - Design Loadings and Standards

       - Tower Design Parameters

       - Tower Physical Parameters

       - Tower Loading

 

  • Manufacture

  • Supply and deliver of standard telecommunication towers of various height

Project-Cenviro.jpg

Development Of Satelite Waste Management Centre Johor (SWMCJ) SWTE Package

-Cenviro (Johor) Sdn. Bhd.

50 tonne/day Schedule Waste to Energy Plant consist of

  • Waste reception facility

  • Incineration facility

  • Energy Recovery facility

  • Flue Gas treatment system

Refurbishment of Mechanical and Pneumatic Ship Unloader at Batu Undan, Mukim Lumut, Dearah Manjung, Perak Darul Ridzuan for Malayan Flour Mills Behad

 

-Cargotec Terminal Solutions (M) Sdn. Bhd.

Mechanical Unloader and Pneumatic Unloader Refurbishment works at Malayan Flour Mills Berhad.

Project-Cargotec.jpg
IMG-20191106-WA0017 (1).jpg

Construction Of New Office/Store for JKR, BER and OPD at Hospital Kuala Lumpur Crossover & Intervention Shaft 1

 

-IDE Totalap Joint Venture

(A Subsidiary of MMC-GAMUDA)

PROJEK MASS RAPID TRANSIT LALUAN 2 :
SUNGAI BULOH – SERDANG – PUTRAJAYA
- Construction of New Office/Store for JKR, BER & OPD at HKL Crossover and IVS 1.

Design, Supply, Construction, Installation, Testing, Commissioning and Maintenance of Additional Line Kamunting Incinerator Plant and Ancillary Works.

 

-UEM Edgenta Mediserve Sdn. Bhd.

We are presently commissioning a project to convert medical waste into energy. The work consists of design, supply, construct, install, test and commission a new Clinical Waste Incinerator Plant with minimum capacity of 1.6 Tonnes per Hour at the existing Kamunting Incinerator Plant area in Kamunting, Perak.

Copy of Untitled.png

China Communications Construction Company (M) Sdn Bhd

Construction, Completion, Testing, Commissioning of the Capping Beam Works, Base slab construction and associated works at Hospital Kuala Lumpur Crossover.

Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE)

Hull Fitting and Steel Work jobs at various vessel in Marine Operation at MMHE including:-

  • Vessel Engineering

  • Vessel Steel Works

  • Vessel Hull Fitting Works

  • Construction Ship

  • LNG Vessel Construction

  • LPG Vessel Construction

  • Heavy Build Engineering

  • Marine Repairs

  • Yard Construction

  • Marine Consultation 

  • Marine Survey

  • Marine Supply

MMHE 8.jpeg
Impact rollers.jpg

TNB Repair and Maintenance Sdn. Bhd.

Supply of Spare rollers for Cold Handling Conveyor capacity of 3300/3800 tph (1600mm & 1800mm Belt width) (Repeated Orders since 2016)

bottom of page